Project of "HEAT RECOVERY BOILERS" successfully handled
One part of the project was moved (as break bulk) from the shipper's plant at Hyderabad to Mumbai port & it took two weeks’ time to cover the distance. This Cargo was loaded on TWO MAFI. This sailed Ex MUMBAI Port To Beirut Port in Lebanon. Another part (containerized cargo) of this project was shipped on 15 containers (9x40’OT + 2x40’FR + 3x40’HC + 1x20’OT) Ex Nhava Sheva Port To Beirut Port in Lebanon.
Total worth of this entire project including Break Bulk was almost One Million USD (USD 992400/-)